top of page

2011

OH NO! 

Bezalel Academy of Arts and Design, Graduation Show

In this work, the floor of a room was elevated by one meter, leaving one meter of  free space between the new floor and the ceiling.      
As seen in the middle picture, a few elements of the old room have been kept - the original width and walls, four standard-sized fluorescent lamps, storage racks, and outlets forelectricity. In seeing the finished work, the viewer becomes confounded by the contrastbetween the dimensions of the room and the remaining large fluorescent lamps, storage racks, and electrical outlets.
The viewer will slowly become aware of how the room changed. The work is an installation site specific work of the previously
existing room.
-
sament, wood, iron construction, floor tiles

bottom of page