top of page
2011
OH NO!
Bezalel Academy of Arts and Design, Graduation Show
In this work, the floor of a room was elevated by one meter, leaving one meter of free space between the new floor and the ceiling.
As seen in the middle picture, a few elements of the old room have been kept - the original width and walls, four standard-sized fluorescent lamps, storage racks, and outlets forelectricity. In seeing the finished work, the viewer becomes confounded by the contrastbetween the dimensions of the room and the remaining large fluorescent lamps, storage racks, and electrical outlets.
The viewer will slowly become aware of how the room changed. The work is an installation site specific work of the previously
existing room.
-
sament, wood, iron construction, floor tiles
bottom of page